A superintendent performs a SiteWalk walkthrough on a jobsite.
Observations, photos, and notes are captured offline if needed.
Inputs are classified into progress updates, issues, or deficiencies.
Schema-based records are created and linked to the project.
Records move: Draft → Finalized → Locked.
Locked records update:
SiteWalk captures reality.
Bynaus executes and locks outcomes.
SiteWalk is a capture surface; Bynaus is the system of record.